PROJECT 1 : SPATIAL DESIGN AND COSTING

SITE CHOSE : TIKAM BATU TOWN, SG.
PETANI, KEDAH.








PRESENTATION FOR SITE ANALYSIS


OUTLINE OF PRESENTATION


  • key plan, location plan and site plan with boundary and area
  • nearby facilities
  • facilities and commercial in site
  • demography
  • land use
  • road, circulation and transportation
  • issues and problems
  • SWOT analysis
  • conclusion






KEY PLAN, LOCATION PLAN AND SITE PLAN WITH BOUNDARY AND AREA


Tikam Batu town is located 68 km from USM and takes about 1 hour driving through north-south expressway and take exit at Sungai Petani Selatan. as shown above in the location plan, Tikam Batu is located at the main junction that connect the places, which are Kota Kuala Muda, Sg. Petani and Kepala Batas. the site plan below shows my group site boundaries and the total area of our study site, which is 14.34 hectares.


source : google earth






NEARBY FACILITIES


the picture below shows the nearby facilities that located near to our study site. the nearby facilities include educational institutions, public clinic, mosques, fire station, and others.












FACILITIES AND COMMERCIAL IN SITE


the picture below shows all the facilities and commercial areas in our study area. the facilities in our study area are post office, bus stop, and police station. the commercial areas area the wet market, the daily market, fruit stalls, petrol station and fruit market.












DEMOGRAPHY


this picture shows the demography of population in Tikam Batu area in the year of 2000 which is the total population is 6,240 people. the majority ethnic of people in Tikam Batu is malay, which is 87.9% from the total population. there are also other ethnic live in Tikam Batu area which are chinese, indians and others. according to the graph of population based on age group, the majority of population are in 0-4 years old, which is 783 people.









LAND USE


the picture below shows the land use map of our study area in Tikam Batu in the year of 2009 and the percentage of every landuse in the boundary. it is a little differ from what i observe at site. this is because the land use may change in the period of time from the year of 2009 until 2011.










ROAD, CIRCULATION AND TRANSPORTATION


there are two road hierarchy that contain in our study area, which are the federal road and the state road. the federal road is shown as red in the picture below while the state road is shown as blue. the federal road connected the two destination which are Sungai Petani and Kepala Batas and also Butterworth. the state road connected Tikam Batu town with Kota Kuala Muda and village area called Batu Lintang. Tikam Batu town located 9 km from Kota Kuala Muda, 27 km from Butterworth and 12 km from Sungai Petani and takes about 15-20 minutes driving.










ISSUES AND PROBLEMS


the picture below shows the problems and issues that exist on our study area.










SWOT ANALYSIS


through this analysis, we can see clearly the strength, weakness, opportunity and threats of our study area.










CONCLUSION


this is the conclusion that my group made based on the site analysis presentation.












DESIGN CONCEPT : WALKABLE LOCAL COMMUNITY TOWN


OUTLINE


  • theme and concept plan
  • components
  • layout details
  • perspective view



THEME AND CONCEPT PLAN

our concept plan is based on the walkable local community town. it is to make the town more thriving, livable and sustainable. other than that, this concept will make the town can have safe transportation options and improve quality of life.


walkable communities will have an effective pedestrian network so that it will allow people to walk to the services, shopping, schools, and jobs in walkable distance based on the local guidelines. it will automatically help in reducing the traffic congestion, air pollution and improve public health.






COMPONENTS








LAYOUT DETAILS








PERSPECTIVE VIEW


this perspective is to show the new elements along the pedestrian network in our study area for example the lighting, garbage, pavement, trees as buffer to transportation lane and as shading effect to the pedestrian walkway and so on.









THE FINAL SUBMISSION











THE PERSPECTIVE VIEWS


the overall perspective of Walkable Local Community Town of Tikam Batu.. this perspective is just to emphasize the transportation network which is the road for vehicle and also the pedestrian walkway that become the identity of this concept..





 the perspective view of the pedestrian walkway, zebra crossing and green landscape around the side and give shading effect to the surrounding... so it will allows people to walk rather than taking cars that  is forbidden to park along the roadside anymore....







 this is the new proposed development in the site which is include the new commercial building on the left side of the picture that is designed to have a local, traditional and classic building concept, and the proper market site that covers with green landscape in the surrounding that provide the shading effect and cooling the micro climate of the area...






this perspective is based on the original site picture... the shop is maintained but the road is converted into pedestrian walkway that surrounded by the green landscape so that the local people can walk to their destinations without being limited by the hot climate..